Stonington WPCA PH1 Interceptor Pipe & Manhole Rehab

Stonington, CT – Water Pollution Control Authority , Phase 1 Interceptor Pipe and Manhole Rehabilitation (#2025-006)

Status

Accepting Bids

Bid Date 9/4/25 2:00pm

Company & Contacts

Stonington WPCA
James Sullivan  

Location

Stonington CT

TOWN OF STONINGTON WATER POLLUTION CONTROL AUTHORITY

ON BEHALF OF THE TOWN OF STONINGTON, CT

PHASE 1: INTERCEPTOR PIPE AND

MANHOLE REHABILITATION

CONTRACT NO. P1 / 2025-006

INVITATION TO BID

Sealed Bids for the Phase 1: Interceptor Pipe and Manhole Rehabilitation project will be received by Mr. James Sullivan at the Stonington Town Hall, 3rd floor Finance Department, 152 Elm Street, Stonington Connecticut 06378, until 2:00 PM local time, Thursday, September 4, 2025, at which time the Bids received will be opened publicly, and read aloud, at the Stonington Town Hall’s Finance Department. Bids submitted after this time will not be accepted. Each bidder must submit a sealed envelope with three hard copies and one electronic copy via a USB thumb drive, the outside of which must be clearly marked “BID #2025-006 ENCLOSED – PHASE 1: INTERCEPTOR SEWER PROJECT” and include the bidder’s company name and address.

Any questions regarding this Bid shall be emailed to Thomas Waterfield at CDM Smith, via email at waterfieldtm@cdmsmith.com, by 3:00 PM local time, Monday, August 25, 2025, with a copy via email to James Sullivan, Director of Finance, Town of Stonington, at jsullivan@stonington-ct.gov.

Joseph Merritt Co., Inc is not responsible for incorrect or missing information