COLES ROAD RECONSTRUCTION PHASE 3 FROM RTE. 9 TO RTE. 3

GENERAL DESCRIPTION OF WORK:

The project involves the reconstruction of approximately 3,061 linear feet of Coles Road between
Route 9 and Route 3 with minor horizontal and vertical realignment, widening of the roadway,
installation of bituminous concrete lip curbing, construction of an 80-foot-long retaining wall and
construction of concrete sidewalk on one side of the road throughout the length of the project and
significant excavation and lining with riprap the adjacent slope. Drainage work includes:
installation of drainage facilities including approximately 27 storm drainage structures,
approximately 1,190 linear feet of 12 in. to 36 in. reinforced concrete pipe, 800 linear feet of 15
in. to 24in. high density polyethylene pipe and approximately 2,200 linear feet of 6-inch
underdrain.

The project is expected to commence on or about September 16, 2019 and be completed within two
hundred seventy-six (276) days. The foregoing is a general outline of work only and shall not be
construed as a complete description of the WORK to be performed under this contract.

4. EXAMINATION AND PROCUREMENT OF CONTRACT DOCUMENTS:

Information for BIDDERS, BID, BID BOND, Form of Agreement, Form of Performance BOND, Form of
Payment BOND, General Conditions, SUPPLEMENTARY GENERAL CONDITIONS, Technical SPECIFICATIONS,
Drawings and other CONTRACT DOCUMENTS may be obtained directly from Joseph Merritt & Company,
650 Franklin Avenue, Hartford, CT 06114,
860.296.2500 at a cost to the bidder beginning July 25, 2019.